NPDES Announcements

Post Reply
NaepcA1
Site Admin
Posts: 1766
Joined: Tue Oct 27, 2009 11:50 am

NPDES Announcements

Post by NaepcA1 »

The U.S. Environmental Protection Agency (EPA) will be issuing a draft National Pollutant Discharge Elimination System (NPDES) general permit for stormwater discharges from construction activities. The Agency will seek public comment on the proposed general permit for 60 days following the publication of the Federal Register notice. EPA plans to finalize this permit prior to the expiration of the 2008 Construction General Permit (June 30, 2011).
Attachments
CGP FRN Fact Sheet Tribes.docx
(52.81 KiB) Downloaded 459 times
FY 2012 Draft NWPG Summaries for Tribes 2-28-2011.docx
(19.18 KiB) Downloaded 475 times
Stormwater Factsheet.doc
(41.5 KiB) Downloaded 513 times

Post Reply